thanks mate its held up to the wind so far and it is windy hear, have got 2 more steel rods to go on the front yet set in concrete, already got 2 at the back thay are holding it for now.
well i cant get to blackpool so spending my time building a kit box for the rollers that are being picked up at blackpool by a mate, got the floor done so far, will take some pics as i go on.
was glad to be of help,thay work well for dust and bloom,but in my case as i have bad asthma also thay dont work on smells so it was just sat in a draw, atb graham.